Introduction to PPH

Components

Inserting Ellavi

Monitoring & Management

Transport

Managing without a drip stand

Removal

C-Section Protocol

Ellavi Management without a Drip Stand

If a drip stand is not available the Ellavi can be easily managed:

1. the full supply bag is lifted to the appropriate height. The uterine balloon is placed and filled as described in chapter 3

2. while the supply bag is held at the appropriate height, close the tap and place the supply bag on the bed.

3. every 60 minutes, lift the supply bag to the appropriate height and open the tap for 30 seconds. Close the tap and place the bag back on the bed.

4. repeat step 3 more often if the patient complains of discomfort.